0:31 AM
Bulletins (CARMEL) CRANE RD AT US 6 CLOSED . WITH A DOWNED UTILITY POLE ( PUTNAM COUNTY 845-628-1300 )
0:31 AM
Bulletins (GREENBURGH) SPRAIN BROOK PKWY NORTHBOUND AT JACKSON AV ACCIDENT. TWO LANES BLOCKED
0:31 AM
Incidents (MOUNT VERNON) S FULTON AVE CLOSED BETWEEN SANFORD BOULEVARD AND 8TH STREET FOR ONGOING CLEANUP OF 3/28 FIRE AT A CHEMICAL SUPPLY BUILDING. CLOSURE WILL REMAIN IN EFFECT UNTIL FURTHER NOTICE. (WESTCHESTER COUNTY)
0:31 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: TAPPAN ZEE BRIDGE (WESTCHESTER-BOUND) NO PROBLEMS TO REPORT // ROCKLAND BOUND NO REPORTED DELAYS
0:31 AM
Transit METRO NORTH TRAINS NO PROBLEMS TO REPORT
0:32 AM
Special Events (YONKERS) BRONX RIVER PKWY IN BOTH DIRECTIONS BETWEEN SCARSDALE RD AND COUNTY CENTER RD CLOSED TO THROUGH TRAFFIC DUE TO "BIKE & SKATE SUNDAYS" FROM 10AM UNTIL 2PM. ALTERNATES ARE: ROUTE 22, ROUTE 100 (CENTRAL AVE) , & THE SPRAIN BROOK PKWY; ALSO ON: 5/11, 5/18, 6/1,6/8, 6/15,6/22,6/29, 9/7, 9/14,9/21,AND 9/28. (**NOTE: WEATHER PERMITTING)
0:32 AM
Daily Construction (NEW CASTLE) HWY 117 IN BOTH DIRECTIONS BETWEEN HWY 120 AND NORTHWAY ROAD CONSTRUCTION. SINGLE LINE TRAFFIC-ALTERNATE DIRECTIONS FOR TREE TRIMMING DAILY FROM 930AM UNTIL 330PM THRU 5 /19. (WESTCHESTER COUNTY)
0:32 AM
Daily Construction (NEW CASTLE) HWY 120 IN BOTH DIRECTIONS AT HWY 117 CONSTRUCTION WORK . (CON-ED AND TREE TRIMMING) WITH LANE CLOSURES SCHEDULED FROM 9:30AM TO 3PM THROUGH MONDAY, MAY 19TH. (WESTCHESTER)
0:32 AM
Daily Construction (GREENBURGH) DOBBS FERRY RD IN BOTH DIRECTIONS BETWEEN HWY 119 AND ROUTE 9A ROAD CONSTRUCTION WITH ALTERNATE CLOSURES FROM 930AM UNTIL 4PM DAILY UNTIL FURTHER NOTICE. (**NOTE: DOBBS FERRY ROAD IS ALSO KNOWN AS ROUTE 100B) (WESTCHESTER COUNTY)
0:32 AM
Daily Construction (MIDDLETOWN) I-84 (NY) IN BOTH DIRECTIONS AT EXIT 2 (MOUNTAIN RD) ROAD CONSTRUCTION . BLOCKS A LANE DAILY FROM 9AM UNTIL 3PM THRU FRIDAY 5/16 AT LEAST. (ORANGE COUNTY)
0:32 AM
Long Term Construction (SOMERS) WOOD ST IN BOTH DIRECTIONS AT MEKEEL ST CLOSED . UNTIL FURTHER NOTICE FOR BRIDGE MAINTENANCE. (NOTE: LOCAL DETOUR) (WESTCHESTER COUNTY)
0:32 AM
Long Term Construction (HARRISON) ANDERSON HILL RD IN BOTH DIRECTIONS BETWEEN I 684 AND LINCOLN AVENUE ROAD CONSTRUCTION. SINGLE LINE TRAFFIC-ALTERNATE DIRECTIONS MONDAY THRU FRIDAY FROM 93OAM UNTIL 330PM UNTIL JULY 11. (**NOTE: THIS PROJECT IS FOR MILLING AND REPAVING, ROAD REPAIRS, AND DRAINAGE IMPROVEMENTS) (WESTCHESTER COUNTY)
0:32 AM
Long Term Construction (HARRISON) ANDERSON HILL RD IN BOTH DIRECTIONS BETWEEN I 684 AND LINCOLN AVENUE ROAD CONSTRUCTION. SINGLE LINE TRAFFIC-ALTERNATE DIRECTIONS MONDAY THRU FRIDAY FROM 93OAM UNTIL 330PM UNTIL JULY 11. (**NOTE: THIS PROJECT IS FOR MILLING AND REPAVING, ROAD REPAIRS, AND DRAINAGE IMPROVEMENTS) (WESTCHESTER COUNTY)
0:32 AM
Long Term Construction (YORKTOWN) OLD CROMPOND RD BETWEEN BOUND BROOK LN AND HUNTER BROOK ROAD CLOSED TO THROUGH TRAFFIC UNTIL FURTHER DUE TO EMERGENCY BRIDGE REPAIRS. LOCAL DETOUR. (NOTE: WILL REMAIN CLOSED FOR A COUPLE OF MONTHS). (WESTCHESTER COUNTY)
0:32 AM
Long Term Construction (CHESTER) WEST AVE IN BOTH DIRECTIONS AT HWY 17 CLOSED . THROUGH DECEMBER 2009 FOR CONSTRUCTION. A DETOUR HAS BEEN POSTED. (ORANGE COUNTY)
0:32 AM
Long Term Construction (BREWSTER) I-84 (NY) WESTBOUND BETWEEN EXIT 21 (RT 6) AND EXIT 20 (I-684) CONSTRUCTION WORK WITH LANE CLOSURES SCHEDULED FROM 10AM TO 2:00PM DAILY THRU MAY 23RD.; SATURDAY WORK IS POSSIBLE, WITH EASTBOUND LEFT LANE CLOSURES IN THE AREA AS NEEDED. (PUTNAM COUNTY)
0:32 AM
Long Term Construction (ARLINGTON) US 44 WESTBOUND AT TAFT AVE CONSTRUCTION WORK . WITH THE RIGHT LANE SCHEDULED TO BE CLOSED FROM 8AM TO 4PM DAILY THROUGH FRIDAY MAY 30TH. (DUTCHESS COUNTY)
0:32 AM
Long Term Construction (WHITE PLAINS) HAMILTON AVE IN BOTH DIRECTIONS BETWEEN FERRIS AVE AND NORTH BROADWAY ROAD CONSTRUCTION. SINGLE LINE TRAFFIC-ALTERNATE DIRECTIONS THRU FRIDAY, 7/25, FROM 930AM UNTIL 3PM AND THEN AGAIN FROM 10PM TO 6AM. (WESTCHESTER COUNTY)
0:32 AM
Long Term Construction (WOODBURY) HWY 32 IN BOTH DIRECTIONS AT BOND ST CONSTRUCTION WORK . WITH LANE CLOSURES POSSIBLE FROM 9AM TO 3PM THROUGH DECEMBER 2008. (ORANGE COUNTY)
0:32 AM
Long Term Construction (NYACK) US 9 W IN BOTH DIRECTIONS AT I 87 CONSTRUCTION WORK . - ALL TRAFFIC WILL SHIFT TO THE NORTHBOUND LANES - THE SOUTHBOUND LANES ARE CLOSED AROUND THE CLOCK. NORTHBOUND WILL ACCOMMODATE TWO-WAY TRAFFIC UNTIL TUESDAY MAY 13TH. (ROCKLAND COUNTY)
0:32 AM
Long Term Construction (NYACK) US 9 W IN BOTH DIRECTIONS AT I 87 CONSTRUCTION WORK . - ALL TRAFFIC WILL SHIFT TO THE NORTHBOUND LANES - THE SOUTHBOUND LANES ARE CLOSED AROUND THE CLOCK. NORTHBOUND WILL ACCOMMODATE TWO-WAY TRAFFIC UNTIL TUESDAY MAY 13TH. (ROCKLAND COUNTY)
0:32 AM
Long Term Construction (MOUNT VERNON) BRONX RIVER PKWY NORTHBOUND BEFORE OAK STREET CONSTRUCTION WORK . WITH THE RIGHT LANE CLOSED AROUND THE CLOCK THROUGH APRIL 30TH, 2010. (**NOTE:CLOSED TO BUILD A NEW EXIT RAMP)
0:32 AM
Long Term Construction (IRVINGTON) SAW MILL RIVER PKWY IN BOTH DIRECTIONS AT NEW YORK STATE THRUWAY (I-87) CONSTRUCTION WORK . WITH DAILY LANE CLOSURES SCHEDULED NORTHBOUND FROM 9:30AM TO 2:30PM, AND SOUTHBOUND FROM 10AM TO 2:30PM THROUGH DECEMBER - 2008.
0:32 AM
Long Term Construction (TARRYTOWN) US 9 IN BOTH DIRECTIONS AT E ELIZABETH ST ROAD CONSTRUCTION DURING THE NIGHT . FOR WATER MAIN WORK NIGHTLY FROM 7PM UNTIL 530AM THRU AT LEAST JUNE 13TH. THERE WILL ALSO BE THE SAME PROJECT, SAME TIMES, AT ROUTE 9 & WILDEY STREET IN TARRYTOWN. (WESTCHESTER COUNTY)
0:32 AM
Long Term Construction (ARLINGTON) HWY 376 IN BOTH DIRECTIONS BETWEEN HOOKER AVE AND MAIN STREET ROAD CONSTRUCTION. RIGHT LANE CLOSED AS NECESSARY, DAILY FROM 7AM UTNIL 530PM THRU OCTOBER 2008. (DUTCHESS COUNTY)
0:32 AM
Long Term Construction (POUGHKEEPSIE) S GRAND AVE IN BOTH DIRECTIONS BETWEEN HOOKER AVE AND ROUTE 44 ROAD CONSTRUCTION WITH ALTERNATE LANE CLOSURES DAILY FROM 7AM UNTIL 530PM THRU DECEMBER 2008. (DUTCHESS COUNTY)
0:32 AM
Long Term Construction (PORT JERVIS) I-84 (NY) EASTBOUND BEFORE EXIT 1 (RT 6) ROAD CONSTRUCTION DURING THE NIGHT . WITH ALTERNATE CLOSURES FROM 8PM UNTIL 5AM DAILY THRU AT LEAST FRIDAY 5/30. (ORANGE COUNTY)
0:32 AM
Long Term Construction (MARBLETOWN) HWY 213 IN BOTH DIRECTIONS BETWEEN US 209 AND ROUTE 32 CONSTRUCTION WORK WITH LANE CLOSURES SCHEDULED FROM 7AM TO 3PM DAILY THROUGH THE END OF MAY. (ULSTER COUNTY)
0:32 AM
Long Term Construction (MONROE) HWY 17 EASTBOUND AFTER RTE 208 CONSTRUCTION WORK . WITH ALTERNATING LANE CLOSURES SCHEDULED FROM 9:30AM TO 2:30PM DAILY THROUGH JUNE. (NOTE: ROUTE 208 IS EXIT 130). (ORANGE COUNTY)
0:31 AM
Bulletins (NEW YORK) CROSS BRONX XPWY EASTBOUND AT JEROME AV ACCIDENT CLEARED
0:31 AM
Bulletins (NEW YORK) WEST SIDE HWY NORTHBOUND BETWEEN 96TH ST (W) AND 125TH ST (W) ROAD CONSTRUCTION. TWO LANES CLOSED UNTIL 3AM
0:31 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: QUEENS MIDTOWN TUNNEL INBOUND NO PROBLEMS TO REPORT // OUTBOUND DOING OK
0:31 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: BROOKLYN BATTERY TUNNEL (INBOUND) NO PROBLEMS TO REPORT | OUTBOUND (BROOKYLN BOUND) OK
0:31 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: 59TH ST BRIDGE OUTBOUND LOWER LEVEL NO PROBLEMS TO REPORT ...UPPER LEVEL OK / INBOUND UPPER LEVEL OK...LOWER LEVEL OK
0:31 AM
Bridges and Tunnels BAYONNE BRIDGE (STATEN ISLAND-BOUND) NO PROBLEMS TO REPORT ON THE SPAN / NEW JERSEY BOUND DOING OK
0:31 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: WILLIAMSBURG BRIDGE (TO MANHATTAN) NO PROBLEMS TO REPORT / BROOKLYN BOUND NO REPORTED PROBLEMS
0:37 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: OUTBOUND HOLLAND TUNNEL DELAYS OF UP TO 5 TO 10 MINUTES // INBOUND SLIGHT DELAYS *** BOTH DIRECTIONS CONSTRUCTION BLOCKING A LANE UNTIL 5AM ***
0:31 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: BROOKLYN BRIDGE (OUTBOUND) TRAFFIC EASING // INBOUND NO REPORTED DELAYS
0:31 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: THROGS NECK BRIDGE (TO QUEENS) NO PROBLEMS TO REPORT // BRONX BOUND OK
0:31 AM
Bridges and Tunnels VERRAZANO NARROWS BRIDGE (STATEN ISLAND-BOUND UPPER LEVEL) NO PROBLEMS TO REPORT .... LOWER LEVEL CLOSED WITH OVERNIGHT CONTSRUCTION UNTIL 5AM // BROOKLYN BOUND LOWER LEVEL CLOSED WITH CONSTRUCTION UNTIL 5AM... UPPER LEVEL NO REPORTED DELAYS
0:37 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: INBOUND GEORGE WASHINGTON BRIDGE UPPER LEVEL NO PROBLEMS TO REPORT ..... LOWER LEVEL NO REPORTED DELAYS \\ OUTBOUND (NJ BOUND) UPPER AND LOWER DECKS SLOW UNDER APT
0:31 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: TRIBOROUGH BRIDGE (TO QUEENS) NO PROBLEMS TO REPORT // BRONX - MANHATTAN BOUND OK
0:31 AM
Bridges and Tunnels OUTERBRIDGE CROSSING (STATEN ISLAND-BOUND) NO PROBLEMS TO REPORT // NJ BOUND IS MOVING WELL
0:31 AM
Bridges and Tunnels LOWER EAST RIVER CROSSINGS: MANHATTAN BRIDGE (TO MANHATTAN) NO PROBLEMS TO REPORT ON THE SPAN // BROOKLYN BOUND OK
0:31 AM
Bridges and Tunnels GOETHALS BRIDGE (STATEN ISLAND-BOUND) ACCIDENT CLEARED. NO PROBLEMS TO REPORT / NEW JERSEY BOUND IS OK
0:31 AM
Bridges and Tunnels UPPER EAST RIVER CROSSINGS: WHITESTONE BRIDGE (TO THE BRONX) NO PROBLEMS TO REPORT / QUEENS BOUND IS MOVING WELL
0:37 AM
Bridges and Tunnels HUDSON RIVER CROSSINGS: INBOUND LINCOLN TUNNEL NO PROBLEMS TO REPORT // OUTBOUND (NEW JERSEY BOUND) NO REPORTED DELAYS ** NORTH TUBE CLOSED WITH OVERNIGHT CONSTRUCTION UNTIL 5AM **
0:31 AM
Transit NEWARK LIBERTY AIRPORT NO PROBLEMS TO REPORT ON ARRIVALS AND DEPARTURES
0:31 AM
Transit LA GUARDIA AIRPORT NO PROBLEMS TO REPORT ON ARRIVALS AND DEPARTURES
0:31 AM
Transit JOHN F KENNEDY INTERNATIONAL AIRPORT NO PROBLEMS TO REPORT ON ARRIVALS AND DEPARTURES
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "N & R" LINES ++ MANHATTAN BOUND TRAINS REROUTED OVER THE MANHATTAN BRIDGE DEAL AVE - CANAL ST UNTIL 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "N" LINE ++ DOWNTOWN TRAINS SKIP 28TH ST, 23RD ST, 8TH ST & PRINCE ST UNTIL 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "G" LINE ++ NO SERVICE 71ST/CONTINENTAL AVE - COURT SQUARE 12:01AM SAT(5/10) - 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "A & C" LINES ++ DOWNTOWN TRAINS SKIP 50TH ST, 23RD ST & SPRING ST & THEN ON THE "F" LINE JAY ST - WEST ST UNTIL 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "4 & 6" LINES ++ DOWNTOWN TRAINS EXPRESS ONLY 125TH ST - GRAND CENTRAL STATION UNTIL 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "2 & 3" LINES ++ TRAINS LOCAL ONLY 96TH ST - CHAMBERS ST UNTIL 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "1 & 2" LINES ++ UPTOWN TRAINS SKIP 79TH ST & 86TH ST UNTIL 5AM MON(5/12) ++
0:31 AM
Transit NEW YORK CITY TRANSIT SUBWAYS CONSTRUCTION WORK ON THE "1" LINE ++ TRAINS SKIP 28TH ST, 23RD ST & 18TH ST & NO SERVICE 14TH ST - SOUTH FERRY UNTIL 5AM MON(5/12) ++
0:31 AM
Parking Regulations (NEW YORK) NEW YORK CITY RESTRICTIONS STREET CLEANING RULES IN EFFECT TODAY (MONDAY, MAY 12]
0:31 AM
Long Term Construction (NEW YORK) WEST SIDE HWY NORTHBOUND AT 72ND ST (W) EXIT CLOSED . PERMANENTLY
0:31 AM
Long Term Construction (NEW YORK) 2ND AVE BETWEEN E 96TH ST AND E 91ST ST CONSTRUCTION WORK CLOSING AT LEAST ONE LANE FOR THE SECOND AVE SUBWAY
0:31 AM
Long Term Construction (NEW YORK) STATEN ISLAND XPWY (I-278) EASTBOUND AT LILY POND AV CONSTRUCTION WORK . ON THE LILY POND AVE OVERPASS WHICH WILL HAVE A LANE SHIFT....NO LANES WILL BE CLOSED. THIS IS PHASE 3 OF THE LILY POND AVE OVERPASS PROJECT AND IS EXPECTED TO RUN UNTIL SEPTEMBER 2009
0:34 AM
Bulletins GARDEN STATE PKWY NORTHBOUND AFTER EXIT 82 (TOMS RIVER) ACCIDENT CLEARED
0:32 AM
Daily Construction (BRIELLE-BRICK) RTE 70 IN BOTH DIRECTIONS AT THE SEPT 11TH MEMORIAL BRIDGE EXPECT DELAYS . ++ AS TRAFFIC WILL BE SHIFTED ONTO THE NEWLY CONSTRUCTED WB SIDE OF THE BRIDGE ++ (2) LANES WILL NOW BE MAINTAINED IN EACH DIR. ON CORRESPONDING SIDES ++ AND A NEW TRAFFIC SIGNAL WILL BE INSTALLED AT THE INTERSECTION OF RT 70 & RIVER RD
0:32 AM
Long Term Construction (LACEY) LACEY RD IN BOTH DIRECTIONS BETWEEN MANCHESTER AV AND RT 9 ROAD CONSTRUCTION ++ EXPECT LANE SHIFTS DUE TO ONGOING WIDENING AND RECONSTRUCTION ++ DELAYS ARE POSSIBLE (OCEAN COUNTY)
0:32 AM
Long Term Construction (MANASQUAN RIVER BRIDGE) HWY 35 NEW ROAD CONSTRUCTION LAYOUT IN BOTH DIRECTIONS BETWEEN BRIELLE(MONMOUTH) AND PT. PLEASANT MOVING THE NB LANES FROM THE CENTER TO THE EAST SIDE OF THE BRIDGE ++ THE SB LANES WILL BE SHIFTED FROM THE WEST SIDE TO THE CENTER OF THE BRIDGE ++ 2 LANES IN EACH DIRECTION WILL BE MAINTAINED
0:32 AM
Long Term Construction (SEA BRIGHT) HWY 36 AT HIGHLANDS BRIDGE ROAD CONSTRUCTION . AS CREWS REPLACE THE CURRENT STRUCTURE ++ , EXPECT SINGLE LANE CLOSURES IN EACH DIRECTION APPROACHING SANDY HOOK AS A TEMPORARY INTERSECTION IS BUILT IN SEA BRIGHT ++ (MONMOUTH COUNTY)
0:32 AM
Long Term Construction (MONMOUTH - OCEAN BORDER) I-195 WESTBOUND ROAD CONSTRUCTION {ROAD RESURFACING} BETWEEN EXIT 31 (HOWELL) AND EXIT 16 (JACKSON) DURING THE OVERNIGHT HOURS ++ SINGLE LANE TRAFFIC AND PERIODIC RAMP CLOSURES TO BE EXPECTED ++ THROUGH AUGUST 2008
0:32 AM
Long Term Construction (MIDDLETOWN) SWIMMING RIVER RD IN BOTH DIRECTIONS BETWEEN CO RTE 520 AND CO RTE 537 ROAD CONSTRUCTION BETWEEN 7AM AND 7PM WEEKDAYS AS NJ NATURAL GAS INSTALLS GAS MAINS IN THE AREA OVER THE NEXT 2 MONTHS ++ NO LANE BLOCKAGES BUT SLOWER THAN NORMAL TRAFFIC IS POSSIBLE (MONMOUTH COUNTY) {{05/08}}
0:32 AM
Long Term Construction (WOODLAND-BARNEGAT) HWY 72 EASTBOUND BETWEEN SAVOY RD AND QUEENS RD ROAD CONSTRUCTION NIGHTLY BETWEEN 9PM AND 6AM ++ EXPECT SINGLE-LANE CLOSURES AND ALTERNATING TRAFFIC ++ ONCE THE WORK IS COMPLETED CREWS WILL RESURFACE THE WESTBOUND SIDE THROUGH THIS AREA (OCEAN COUNTY)
0:32 AM
Long Term Construction (MARLBORO) CO RTE 520 IN BOTH DIRECTIONS BETWEEN ST RTE 34 N AND BOUNDARY RD CLOSED DUE TO ROAD CONSTRUCTION FROM 7AM TO 7PM FOR UTILITY WORK {{NJ NAT GAS IS INSTALLING GAS LINES IN THE AREA THROUGH MID MAY}} (MONMOUTH COUNTY)
0:32 AM
Long Term Construction (MIDDLETOWN) MIDDLETOWN LINCROFT RD IN BOTH DIRECTIONS BETWEEN CASTLE DR AND BAMM HOLLOW RD CLOSED DUE TO ROAD CONSTRUCTION (FOR WATER-MAIN WORK) 8AM TO 4PM ++ NORTH AND SOUTHBOUND TRAFFIC WILL BE DETOURED ONTO HOLLAND AND RED HILL ROADS ++ PROJECT EXPECTED TO LAST THROUGH THE END OF MAY AND WILL BE OPEN TO TRAFFIC NIGHTS AND WEEKENDS (MONMOUTH COUNTY)
0:32 AM
Long Term Construction (MIDDLETOWN) DWIGHT RD AT RED HILL RD CLOSED DUE TO ROAD CONSTRUCTION . ***AROUND THE CLOCK*** ++ EXPECT DELAYS ++ PLAN ON USING HOLLAND ROAD OR BAMM HOLLOW ROAD AS ALTERNATES ++ PROJECT EXPECTED TO LAST 6 WEEKS (MONMOUTH COUNTY)
0:31 AM
Bulletins (NEWARK) TRUCK RT 1 & 9 NORTHBOUND AT NEW JERSEY TURNPIKE EASTERN SPUR ON-RAMP CLOSED . UFN .. DUE TO ONGOING FLOODING
0:31 AM
Incidents (NORTH BERGEN ) RT 1 & 9 IN BOTH DIRECTIONS BETWEEN 51ST ST AND 69TH ST DELAYS POSSIBLE ONLY ONE LANE OPEN IN EACH DIRECTION DUE TO ROAD WORK UNTIL MONDAY MORNING (5/12)...[NOTE: CREWS STARTED WORK ON THE ROAD AND DUG A LARGE HOLE BUT WILL NOT CONTINUE WITH THE WORK UNTIL MONDAY MORNING] . PD
0:31 AM
Transit NEW JERSEY TRANSIT TRAINS NO PROBLEMS TO REPORT // NJ BUSES OK // PATH TRAINS OK
0:31 AM
Daily Construction (JERSEY CITY) ST RTE 139 EASTBOUND BETWEEN COVERED RDWY AND JERSEY AVENUE MAJOR ROAD CONSTRUCTION UNTIL 9/1/2009. NEW TRAFFIC PATTERN IN EFFECT ... MOTORISTS PROHIBITED FROM MAKING LEFT TURNS FROM THE NEWARK BAY EXTENSION ONTO JERSEY AVENUE & NO RIGHT TURNS FROM 139 TO JERSEY AVENUE
0:31 AM
Daily Construction (WASHINGTON TWP, BERGEN COUNTY) WASHINGTON AVE BETWEEN PASCACK RD AND LAFAYETTE AVE CLOSED DUE TO ROAD CONSTRUCTION ..WEEKDAYS 9AM-4:30PM UNTIL MID-JUNE...FOLLOW DETOURS
0:31 AM
Long Term Construction (WAYNE) RT 46 WESTBOUND AT RT 23 ROAD CONSTRUCTION . - THE COMMON RAMP FROM WESTBOUND RT 46 TO NORTHBOUND RT 23 AND WESTBOUND RT 80 - ONLY ONE LANE WILL BE OPEN UNTIL DECEMBER 2008 DUE TO ROAD WORK.. EXPECT DELAYS DURING PEAK TRAVEL TIMES.
0:31 AM
Long Term Construction (LODI) ESSEX ST IN BOTH DIRECTIONS AT HWY 17 CLOSED . FOR LONG TERM ROAD WORK UNTIL THE END OF MAY 2008 + EXPECT LANE CLOSURES ON RT.17 ON OFF-PEAK HOURS AS WELL.
0:31 AM
Long Term Construction (WAYNE) I-80 WESTBOUND AT RT 46 / RT 23 (EXIT 53) OFF-RAMP CLOSED . TO ROUTE 23 SOUTH FOR LONG TERM CONSTRUCTION...MOTORISTS ARE ADVISED TO USE 46 TO 23 SOUTH INSTEAD... THE CONSTRUCTION IS SCHEDULED TO BE IN PLACE THRU THE FALL OF 2008
0:32 AM
Bulletins (NEWARK) I-78 EASTBOUND AT EXIT 56 (CLINTON AV) ACCIDENT CLEARED . FROM THE LOCALS
0:32 AM
Bulletins RT 22 (N.J.) WESTBOUND BETWEEN WARRENVILLE RD AND MOUNTAIN AV ACCIDENT BLOCKING A LANE // EASTBOUND ALL LANES REOPENED (SOMERSET)
0:32 AM
Long Term Construction (EDISON) RT 1 NORTHBOUND BETWEEN PIERSON AVE AND AMBOY AV ROAD CONSTRUCTION. RIGHT LANE CLOSED + TWO LANES MAINTAINED + AND AGAIN + FROM GRANDVIEW AVE (EDISON) TO FORD AVE (WOODBRIDGE) UNTIL 2009 + [MIDDLESEX COUNTY]
0:32 AM
Long Term Construction (BRANCHBURG) US 22 EASTBOUND AT STATION RD ROAD CONSTRUCTION . ..BRIDGE REPLACEMENT WORK...TRAFFIC IS BEING SHIFTED TO THE MEDIAN UNTIL THE END OF MAY....EXPECT DELAYS DURING PEAK TRAVEL TIMES
0:32 AM
Long Term Construction (NEW BRUNSWICK) RT 18 IN BOTH DIRECTIONS BETWEEN GEORGE ST AND RT 1 ROAD CONSTRUCTION - LONG TERM ROAD WIDENING PROJECT SCHEDULED UNTIL FURTHER NOTICE. THE NORTHBOUND OFF-RAMP TO GEORGES ST IS CLOSED AS PART OF THE WORK. EXPECT EXTRA HEAVY TRAFFIC THROUGH THE AREA.
0:32 AM
Long Term Construction (MIDDLESEX) HWY 28 WESTBOUND BETWEEN PROSPECT PL AND EAST ST (BOUND BROOK) CLOSED DUE TO ROAD CONSTRUCTION UNTIL SEPTEMBER...THE EB SIDE WILL TAKE TWO WAY TRAFFIC...EXPECT DELAYS..ESPECIALLY DURING PEAK TRAVEL TIMES